The safe operation of bottle blowing machine should master the following common sense:
(1) Before start-up of each shift, add lubricating oil to each moving part once. (manipulator, manipulator guide rail, mold opening and closing guide rail)
(2) Arm swing can be added once every (3-4) days. Large chain and small chain of heater can be used once a month. Check the main engine reducer and heater reducer for oil shortage frequently. The main engine bearing can be added once every 3 months.
(3) Before production, check whether the moving parts are firm, whether the screws are loose and fall off, especially where the impact force is strong, and whether the belt drive part is abnormal.
(4) Check whether the high pressure air source, low pressure air source, power supply and water source are normal.
(5) Check whether the emergency stop switch, safety door switch and protection device detection switch are normal.
(6) Check whether the heating head enters the embryo and the embryo dropping part works normally. If the embryo is not inserted in place, the nut of embryo pressing device can be adjusted.
(7) Check whether the lamp tube is damaged or broken. It should be replaced in time.
(8) Check the pneumatic components for air leakage and sensitivity.
(9) Check whether the triplet has abnormal air leakage, whether it is blocked, and whether the water storage in the water cup is too full.
(10) When the solenoid valve of automatic bottle blowing machine is abnormal, it should be cleaned in time (3.5 million bottles per blow).